ID RECOMMENDED PRACTICE TITLE ( clic here to download) REV. DATE
10S-90 Cost Engineering Terminology 20/06/2018
11R-88 Required Skills and Knowledge of Cost Engineering 18/06/2013
13S-90 Recommended Method for Determining Building Area 01/11/1990
14R-90 Responsibility and Required Skills for a Project Planning and Scheduling Professional 19/09/2006
15R-81 Profitability Methods 16/07/2008
16R-90  Conducting Technical and Economic Evaluations – As Applied for the Process and Utility Industries  01/04/1991
17R-97 Cost Estimate Classification System 29/11/2011
18R-97 Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries 01/03/2016
19R-97 Estimate Preparation Costs in the Process Industries 19/06/1998
20R-98 Project Code of Accounts 27/01/2003
21R-98 Project Code of Accounts – As Applied in Engineering, Procurement, and Construction for the Process Industries 27/01/2003
22R-01 Direct Labor Productivity Measurement – As Applied in Construction and Major Maintenance Projects 26/04/2004
23R-02 Identification of Activities 03/05/2007
24R-03 Developing Activity Logic 26/03/2004
25R-03 Estimating Lost Labor Productivity in Construction Claims 13/04/2004
27R-03 Schedule Classification System 12/11/2010
28R-03 Developing Location Factors by Factoring – As Applied in Architecture, Engineering, Procurement, and Construction 19/10/2006
29R-03 Forensic Schedule Analysis 25/04/2011
30R-03 Implementing Project Constructability 20/05/2009
31R-03 Reviewing, Validating, and Documenting the Estimate 12/05/2009
32R-04 Determining Activity Durations 14/01/2012
33R-15 Developing the Project Work Breakdown Structure 01/03/2016
34R-05 Basis of Estimate 02/05/2014
35R-09 Development of Cost Estimate Plans – As Applied for the Building and General Construction Industries 14/02/2015

36R-08

Development of Cost Estimate Plans – As Applied in Engineering, Procurement, and Construction for the Process Industries 14/02/2015
37R-06 Schedule Levels of Detail—As Applied in Engineering, Procurement, and Construction 20/03/2010
38R-06 Documenting the Schedule Basis 18/06/2009
39R-06 Project Planning – As Applied in Engineering and Construction for Capital Projects 08/12/2011
40R-08 Contingency Estimating – General Principles 25/06/2008
41R-08 Risk Analysis and Contingency Determination Using Range Estimating 27/10/2008
42R-08 Risk Analysis and Contingency Determination Using Parametric Estimating 26/05/2011
43R-08 Risk Analysis and Contingency Determination Using Parametric Estimating – Example Models as Applied for the Process Industries 28/12/2011
44R-08 Risk Analysis and Contingency Determination Using Expected Value 04/12/2012
45R-08 Scheduling Claims Protection Methods 01/06/2009
46R-11 Required Skills and Knowledge of Project Cost Estimating 16/01/2013
47R-11 Cost Estimate Classification System – As Applied in the Mining and Mineral Processing Industries 06/07/2012
48R-06 Schedule Constructability Review 28/08/2009
49R-06 Identifying the Critical Path 05/03/2010
52R-06 Prospective Time Impact Analysis – As Applied in Construction 04/05/2017
53R-06 Schedule Update Review – As Applied In Engineering, Procurement and Construction 14/08/2008
54R-07 Recovery Scheduling—As Applied in Engineering, Procurement, and Construction 19/11/2010
55R-09 Analyzing S-Curves 10/11/2010
56R-08 Cost Estimate Classification System – As Applied for the Building and General Construction Industries 05/12/2012
57R-09 Integrated Cost and Schedule Risk Analysis Using Monte Carlo Simulation of a CPM Model 18/06/2011
58R-10 Escalation Estimating Principles and Methods Using Indices 25/05/2011
59R-10 Development of Factored Cost Estimates – As Applied in Engineering, Procurement, and Construction for the Process Industries 18/06/2011
60R-10 Developing the Project Controls Plan 21/12/2011
61R-10 Schedule Design – As Applied in Engineering, Procurement, and Construction 11/10/2013
62R-11 Risk Assessment: Identification and Qualitative Analysis 11/05/2012
63R-11 Risk Treatment 23/08/2012
64R-11 CPM Schedule Risk Modeling and Analysis: Special Considerations 02/05/2012
65R-11 Integrated Cost and Schedule Risk Analysis and Contingency Determination Using Expected Value 02/05/2012
66R-11 Selecting Probability Distribution Functions for use in Cost and Schedule Risk Simulation Models 24/08/2012
67R-11 Contract Risk Allocation – As Applied in Engineering, Procurement, and Construction 14/01/2014
68R-11 Escalation Estimating Using Indices and Monte Carlo Simulation 02/05/2012
69R-12 Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Hydropower Industry 25/01/2013
70R-12 Principles of Schedule Contingency Management – As Applied in Engineering, Procurement and Construction 16/10/2013
71R-12 Required Skills and Knowledge of Decision and Risk Management 17/06/2013
72R-12 Developing a Project Risk Management Plan 25/04/2013
73R-13 Establishing Labor Productivity Norms 14/01/2014
74R-13 Basis of Estimate – As Applied for the Software Services Industries 02/04/2014
75R-13 Schedule and Cost Reserves within the Framework of ANSI EIA-748 24/10/2014
77R-15 Quality Control/Quality Assurance for Risk Management 03/06/2016
78R-13 Original Baseline Schedule Review – As Applied in Engineering, Procurement, and Construction 23/10/2014
79R-13 Level of Effort Planning and Execution on Earned Value Projects – Within the Framework of ANSI EIA-748 24/10/2014
80R-13 Estimate at Completion (EAC) 11/11/2014
81R-13 Required Skills and Knowledge of Earned Value Management 01/05/2014
82R-13 Earned Value Management (EVM) Overview and Recommended Practices Consistent with EIA-748-C 04/05/2017
83R-13 Organizational Breakdown Structure and Responsibility Assignment Matrix 01/05/2014
84R-13 Planning and Accounting for Adverse Weather 15/09/2015
85R-14 Use of Decision Trees in Decision Making 14/11/2014
86R-14 Variance Analysis and Reporting 19/10/2015
87R-14 Cost Estimate Classification System – As Applied for the Petroleum Exploration and Production Industry 10/03/2015
 88R-15 Tracking the Procurement Process using a CPM Schedule – As Applied in Construction 2016/12/28
 89R-16 Management Summary Schedule 2017/10/18
 90R-17 Statusing the CPM Schedule – As Applied in Construction 2018/03/19
 91R-16 Schedule Development 2018/03/20
 92R-17 Analyzing Near-Critical Paths 2017/10/18
 93R-17 Schedule Logs 2018/04/18

  • 2018 AACE INTERNATIONAL - ITALY SECTION
  • Partita Iva 14528951008